• Home
      • |
      • About Us
      • |
      • Products
      • |
      • Case
      • |
      • Contact Us
      • Chinese
      • EN
  • Products 产品中心
    • Drill Rigs
    • Drill Rod
    • Drill Bit
    • Mud Pumps
    • hydraulic clamp
    • Tools and accessories
      Srearch
    Project Case Home > Project Case
    Ceremony for finished drilling hole in Cang Shan

    Time : 2011

    Site: Can Shan Lan Ling

    Project : general exploration for Iron Mile

    Hole Mark: ZK65-1

    Drilling Machine Model :XY-6B

    Hole depth of finished drilling hole : 2188.28 m 

    Diameter of finished drilling hole : 75 mm

    Content : Spent 195 days to finish construction . the deepest hole in southeast area in Shandong province at that time .

    • Drill Rigs
      • core drill rig
      • Water well drilling rig
    • Drill Rod
      • Drill Rod
    • Drill Bit
      • Drill Bit
    • Mud Pumps
      • BW-160
      • BW-250
      • BW-320
    • hydraulic clamp
      • NY-800
      • SQ114/8
    • Tools and accessories
      • Drilling tower
  • Copyright 2008-2014 JINNUOXIN Engineering All Rights Reserved. Support:HuaxiaNet